Underground Potash Mine

During commissioning of the mine, an underground inrush flooded the mine causing damage. CCi undertook the monitoring and support of the recovery plan created by the insured to re-establish the underground operations and provided advice to the insurers on the ‘but for’ position.

Australia

Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date.

USA

Oil Refinery

A catastrophic failure of a heat exchanger resulted in extensive damage. CCi prepared a detailed delay analysis to establish whether non-incident related works prolonged the overall period of disruption.

India

Crude Oil Refinery

Unprecedented rainfall caused significant damage to stored equipment at the world’s largest refining hub, with crude processing capacity of 1.24 million barrels per day.

USA

Power Station

A significant fire damaged large sections of a partially constructed Power Plant. The Insured ultimately completed the project 18 months late and submitted a DSU claim for 18 months.