275kV Infrastructure Project

CCi was appointed as the quantum expert on behalf of the contractor on a dispute between it and the conductor supplier involving an alleged defective conductor and the financial consequences of it. The CCi expert prepared draft, joint and final reports for the High Court litigation liaising with instructing solicitors, witnesses of fact and the QC. They also advised on the Part 36 offer that was ultimately accepted by the other party shortly before trial.

UK

PFI Acute Emergency Hospital Project

CCi was appointed to compile numerous claim documents for MEP design fees arising from revisions to the architectural BIM model.

UK

London Underground Line Extension Project (Crossrail)

CCI was appointed to provide commercial support and key performance and cost indicators to the executive board.

USA

Oil Refinery

A catastrophic failure of a heat exchanger resulted in extensive damage. CCi prepared a detailed delay analysis to establish whether non-incident related works prolonged the overall period of disruption.

USA

1600MW Coal Fired Power Station

Following catastrophic failure of the ID fan, CCi was appointed to analyse the project’s rebuild schedule and to conduct a ‘health check’ assessing the schedule’s suitability with regards to supporting the overall project management process and assisting with the claim.