1600MW Coal Fired Power Station

Following catastrophic failure of the ID fan, CCi was appointed to analyse the project’s rebuild schedule and to conduct a ‘health check’ assessing the schedule’s suitability with regards to supporting the overall project management process and assisting with the claim. CCi also established the project’s pre-incident position, identifying delays to the scheduled date for the start of commercial operations and verified resultant delays from damage to achieve a successful settlement of the claim.

UK

Tunnel Drive Project

A tunnel drive of several kilometres with associated shafts and bore pits encountered unexpected physical conditions.

Thailand

Underground Potash Mine

During commissioning of the mine, an underground inrush flooded the mine causing damage.

UK

714MW Offshore Wind Farm

Supply delays relating to some of the turbine jackets were alleged to have resulted in a critical delay to the project.

Cairns, Australia

Bruce Highway – Cairns Southern Access Corridor – Stage 3

CCi was engaged by the consortium contractor to review the collaborative project agreement (Contract), recommend a mechanism for time extension under the Contract, and assess the Contractor’s submitted extension of time and associated costs claim.