Aluminium Smelter

Following force majeure events, the aluminium production facility suffered a total ‘freeze’ of all operating liquid aluminium pots. At the time of the incident the project was ramping up the newly constructed facilities. CCi’s role included preparation of a ‘but for’ assessment of the timeline-related factors. This identified events that would have interrupted the normal progress of the ramp-up process had the force majeure event not occurred.

UK

Roadway Project

CCi was appointed as expert to determine the time and quantum issues arising during construction.

Costa Rica

40Ha Container Terminal

Storm damage during the dredging and reclamation phase of the project resulted in the implementation of a suite of mitigation measures.

Saudi Arabia

Process Plant (acetic acid, CO & VAM)

Expert advisor – visiting the site in 2009/2010 and reviewing the Primavera critical path schedules to assess their reliability.

Europe

Subsea Production Umbilicals

Two damage events, both concerning cracking to the outer sheaths of the Umbilicals led to critical delay of the ‘load out’ milestone.