Roadway Project

CCi was appointed as expert to determine the time and quantum issues arising during construction. CCi provided reports for adjudication and appeared at tribunal in arbitration to provide expert evidence which resulted in a successful project settlement.

Australia

7.5 Hectare Central Business District Development

CCi was appointed to quantify delay suffered to the construction of two commercial towers (43 and 39 floors respectively) in Sydney’s Central Business District (CBD) following a fire within the shared basement.

UK

Humber Pipeline Tunnel

The construction of a 5km National Grid replacement tunnel 30m below the Humber Estuary supplying a quarter of the UK’s national gas became the largest and longest hydraulically inserted gas pipeline and was the heaviest moving man-made object.

USA

LNG Plant

A named windstorm caused widespread damage to the construction of an LNG plant.

UK

Roadway Project

CCi was appointed as expert to determine the time and quantum issues arising during construction.