
Oil Refinery
Location: USA

A catastrophic failure of a heat exchanger resulted in extensive damage. CCi prepared a detailed delay analysis to establish whether non-incident related works prolonged the overall period of disruption. Consequently, the dispute was referred to arbitration, with CCi’s findings that incident related repairs were paced to match non-incident related maintenance works contributing to the eventual claim settlement prior to the hearing.