2400MW Hydro Power Plant

Failure of the Auxiliary Diversion Tunnel (ADT) and subsequent flooding of the underground power complex caused severe delay to the completion of this project, resulting in fundamental changes in the design. Detailed investigations were undertaken in accordance with the insurance policy exclusions to establish which delay events were attributable solely to the damage to the ADT or GAD as opposed to consequential delays caused by the defect improvement works or events unrelated to the incident. CCi’s analysis was relied upon to establish an agreement between the insured and insurers.

UK

Combined Heat and Intelligent Power Plant (CHiP)

The Contractor entered into a D&B FIDIC form of contract and suffered over a year’s delay with the design, build and commissioning of the CHiP plant.

USA

High-rise Construction

Two separate water intrusion events occurred during the construction of a high-rise residential building in New York City.

Costa Rica

40Ha Container Terminal

Storm damage during the dredging and reclamation phase of the project resulted in the implementation of a suite of mitigation measures.

USA

1600MW Coal Fired Power Station

Following catastrophic failure of the ID fan, CCi was appointed to analyse the project’s rebuild schedule and to conduct a ‘health check’ assessing the schedule’s suitability with regards to supporting the overall project management process and assisting with the claim.