2400MW Hydro Power Plant

Failure of the Auxiliary Diversion Tunnel (ADT) and subsequent flooding of the underground power complex caused severe delay to the completion of this project, resulting in fundamental changes in the design. Detailed investigations were undertaken in accordance with the insurance policy exclusions to establish which delay events were attributable solely to the damage to the ADT or GAD as opposed to consequential delays caused by the defect improvement works or events unrelated to the incident. CCi’s analysis was relied upon to establish an agreement between the insured and insurers.

USA

Oil Refinery

A catastrophic failure of a heat exchanger resulted in extensive damage. CCi prepared a detailed delay analysis to establish whether non-incident related works prolonged the overall period of disruption.

Australia

7.5 Hectare Central Business District Development

CCi was appointed to quantify delay suffered to the construction of two commercial towers (43 and 39 floors respectively) in Sydney’s Central Business District (CBD) following a fire within the shared basement.

Latin America

FPSO

Two FPSO’s were constructed at yards in Central America and fitted out in ports in Latin America.

Australia

Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date.