Semi-Submersible

A Semi-Submersible brown field project, consisting of the conversion of a large exploration vessel to a production vessel overran in time and in money. As expected in the conversion of a 25 year old structure that has spent its life at sea, many variations and changes were required that had not been foreseen after the initial survey. Weather, changes and general delays led to a significant dispute. Appointed as experts in quantum the role was to present an independent report to the Tribunal. Once the expert report was produced the claimant conceded sufficient elements of their claim that a settlement for a third of the initial claim was agreed.

USA

Potash Mine

A conveyor at a Potash mine that carried product to warehouses before it could be loaded onto trains and distributed to customers collapsed.

Spain

Tunnel Project

CCi was appointed by the tunnelling subcontractor as quantum expert and worked alongside the geotechnical expert to give an opinion on the losses incurred as a result of unforeseeable ground conditions.

UK

PFI Acute Emergency Hospital Project

CCi was appointed to compile numerous claim documents for MEP design fees arising from revisions to the architectural BIM model.

Australia

Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date.