Tunnel Project

CCi was appointed by the tunnelling subcontractor as quantum expert and worked alongside the geotechnical expert to give an opinion on the losses incurred as a result of unforeseeable ground conditions. The set of arbitration was in Spain but the case involved a German geotechnical expert, a Spanish main contractor, a Brazilian arbitrator and an English subcontractor with no distinction as to what language the conditions of contract was governed by (Spanish or English). Case management and production of documents in various languages was an interesting challenge.

Australia

Desalination Plant

Seven independent delay events were claimed to have impacted the critical path during the project to increase the desalination facilities’ annual output from 50 to 100 billion litres annually.

UK

London Underground Line Extension Project (Crossrail)

CCI was appointed to provide commercial support and key performance and cost indicators to the executive board.

Saudi Arabia

Process Plant (acetic acid, CO & VAM)

Expert advisor – visiting the site in 2009/2010 and reviewing the Primavera critical path schedules to assess their reliability.

North Sea

Semi-Submersible

A Semi-Submersible brown field project, consisting of the conversion of a large exploration vessel to a production vessel overran in time and in money.