Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date. CCi was appointed as the critical path expert to benchmark the project’s pre-incident status and levels of available float, and to advise as to the expected impact of the events. CCi’s critical path analysis ultimately demonstrated that due to the management of activity relationships, criticality was artificially imposed upon certain areas. Following a recalibration of activity relationships, it was agreed that the events had had no impact.

Europe

730MW Ultra-supercritical Coal Fired Power Station

Originally suffering a catastrophic failure of the transformer, the project suffered several delay events, including 13 instances of damage.

UK

61MW Onshore Wind Farm

The Super Grid Transformer suffered delay during transit which led to critical delays to the phased handover of the plant.

UK

275kV Infrastructure Project

CCi was appointed as the quantum expert on behalf of the contractor on a dispute between it and the conductor supplier involving an alleged defective conductor and the financial consequences of it.

USA

Potash Mine

A conveyor at a Potash mine that carried product to warehouses before it could be loaded onto trains and distributed to customers collapsed.