Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date. CCi was appointed as the critical path expert to benchmark the project’s pre-incident status and levels of available float, and to advise as to the expected impact of the events. CCi’s critical path analysis ultimately demonstrated that due to the management of activity relationships, criticality was artificially imposed upon certain areas. Following a recalibration of activity relationships, it was agreed that the events had had no impact.

Brazil

1.4GW Combined Cycle Power Plant

During the equipment commissioning operation for the project’s steam turbine unit, a system error triggered an unscheduled shutdown of the lubricating oil pumps causing damage to the turbine shaft.

Kazakhstan

Ferrochrome Smelter

A catastrophic breakout of molten metal caused significant damage to the construction of the ferrochrome melt shop.

Chile

210MW Solar Plant

A fire occurred in the central tower of a solar plant where the solar receiver is located.

Colombia

2400MW Hydro Power Plant

Failure of the Auxiliary Diversion Tunnel (ADT) and subsequent flooding of the underground power complex caused severe delay to the completion of this project, resulting in fundamental changes in the design.