Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date. CCi was appointed as the critical path expert to benchmark the project’s pre-incident status and levels of available float, and to advise as to the expected impact of the events. CCi’s critical path analysis ultimately demonstrated that due to the management of activity relationships, criticality was artificially imposed upon certain areas. Following a recalibration of activity relationships, it was agreed that the events had had no impact.

Australia

Vanadium Mine

Following fire damage at the world’s largest vanadium mine, two divergent hypothetical timelines emerged relating to the redesigned reinstatement of the beneficiation process plant.

UK

PFI Acute Emergency Hospital Project

CCi was appointed to compile numerous claim documents for MEP design fees arising from revisions to the architectural BIM model.

UAE

Aluminium Smelter

Following force majeure events, the aluminium production facility suffered a total ‘freeze’ of all operating liquid aluminium pots.

India

Crude Oil Refinery

Unprecedented rainfall caused significant damage to stored equipment at the world’s largest refining hub, with crude processing capacity of 1.24 million barrels per day.