FPSO

Two FPSO’s were constructed at yards in Central America and fitted out in ports in Latin America. The Projects overran in both time and cost, resulting in claims exceeding US$1bn. Detailed quantum investigations were undertaken, tens of thousands of cost files in multiple languages were analysed, and a final figure presented for Arbitration. Then at a New York venue, expert evidence was given and was well received by a panel of three international arbitrators.

Auckland, New Zealand

Puhoi to Warkworth Motorway

CCi provided Independent delay expert service for the Contractor. The project was delivered through Public-Private Partnership between the New Zealand Government and the Northern Express Group (NX2) to design and construct a four-lane highway with a central median safety barrier.

USA

High-rise Construction

Two separate water intrusion events occurred during the construction of a high-rise residential building in New York City.

USA

1600MW Coal Fired Power Station

Following catastrophic failure of the ID fan, CCi was appointed to analyse the project’s rebuild schedule and to conduct a ‘health check’ assessing the schedule’s suitability with regards to supporting the overall project management process and assisting with the claim.

Australia

Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date.