Process Plant (acetic acid, CO & VAM)

Expert advisor – visiting the site in 2009/2010 and reviewing the Primavera critical path schedules to assess their reliability. Advising the on-site planning department on project controls techniques. Successfully assisted the MEIP sub-contractor to negotiate acceleration payments in 2010.  5,000 workers on site.

Australia

Floating Wet Concentrator Plant

The floating wet concentrator plant developed a sudden list (lean) to port side within the pond before settling on the bottom of the pond and mining was curtailed as a result.

Chile

210MW Solar Plant

A fire occurred in the central tower of a solar plant where the solar receiver is located.

USA

LNG Plant

A named windstorm caused widespread damage to the construction of an LNG plant.

UK

PFI Acute Emergency Hospital Project

CCi was appointed to compile numerous claim documents for MEP design fees arising from revisions to the architectural BIM model.