LNG Plant

A named windstorm caused widespread damage to the construction of an LNG plant. Significant damage was caused to pipe that had been prefabricated and was waiting to be installed at the facility. CCi carried out an analysis of the delays incurred to the project prior to the storm and identified pre-storm delay that had not been accounted for in the forecast Commercial Operation Date (COD). In addition, CCi identified delays to the fabrication and installation of structural steel that meant the delay caused to the COD by having to replace pipe was much less than originally claimed by the Insured.

UK

Tunnel Drive Project

A tunnel drive of several kilometres with associated shafts and bore pits encountered unexpected physical conditions.

Europe

Double Deck Tunnel

A series of incidents concerning a Tunnel Boring Machine (TBM) with a diameter of 13.7m, were claimed to have caused delay to the critical path of the project.

USA

Bridge Project

Construction of a bridge spanning the Ohio River was delayed as a result of flooding from a high river event.

UK

Ground Engineering and Geotechnical Pre-construction Services Project (HS2)

CCi was appointed to provide claims management support on the largest geotechnical ground investigation programme in Europe, delivered from commencement to final account.