210MW Solar Plant

A fire occurred in the central tower of a solar plant where the solar receiver is located. Carried out an investigation to establish the pre-incident position and performed a technical analysis of the critical route of the project and possible causes of any delay in commercial operation, which helped our client to facilitate early settlement.

Australia

Floating Wet Concentrator Plant

The floating wet concentrator plant developed a sudden list (lean) to port side within the pond before settling on the bottom of the pond and mining was curtailed as a result.

Europe

187MW Hydro Power Plant

Following the collapse of the project’s headrace tunnel, CCi was appointed as the delay expert to produce an analysis that would eventually facilitate a mediated settlement.

Saudi Arabia

Process Plant (acetic acid, CO & VAM)

Expert advisor – visiting the site in 2009/2010 and reviewing the Primavera critical path schedules to assess their reliability.

UK

Roadway Project

CCi was appointed as expert to determine the time and quantum issues arising during construction.