Bridge Project

Construction of a bridge spanning the Ohio River was delayed as a result of flooding from a high river event. CCi was retained by underwriters to investigate the amount of delay caused to the project completion date by repairing damage from the flood. CCi’s analysis showed that while the flood had caused critical delay to the project completion date at the time of the loss, delays to procurement of sections of the bridge after the loss meant ultimately the flood caused no actual delay to the project completion date.

Australia

Floating Wet Concentrator Plant

The floating wet concentrator plant developed a sudden list (lean) to port side within the pond before settling on the bottom of the pond and mining was curtailed as a result.

UK

275kV Infrastructure Project

CCi was appointed as the quantum expert on behalf of the contractor on a dispute between it and the conductor supplier involving an alleged defective conductor and the financial consequences of it.

North Sea

Semi-Submersible

A Semi-Submersible brown field project, consisting of the conversion of a large exploration vessel to a production vessel overran in time and in money.

USA

Steel Plant

The exhaust pipe from the top of a steel furnace collapsed through the roof and required repair before the furnace could return to production.