Bridge Project

Construction of a bridge spanning the Ohio River was delayed as a result of flooding from a high river event. CCi was retained by underwriters to investigate the amount of delay caused to the project completion date by repairing damage from the flood. CCi’s analysis showed that while the flood had caused critical delay to the project completion date at the time of the loss, delays to procurement of sections of the bridge after the loss meant ultimately the flood caused no actual delay to the project completion date.

Canada

Oil & Gas

At the procurement stage of an Oil Sands Project, worked with the Owner’s Supply Chain and Legal departments over two years to prepare requests for proposal and draft, negotiate and resolve construction contracts.

USA

LNG Plant

A named windstorm caused widespread damage to the construction of an LNG plant.

Australia

7.5 Hectare Central Business District Development

CCi was appointed to quantify delay suffered to the construction of two commercial towers (43 and 39 floors respectively) in Sydney’s Central Business District (CBD) following a fire within the shared basement.

Kazakhstan

Ferrochrome Smelter

A catastrophic breakout of molten metal caused significant damage to the construction of the ferrochrome melt shop.