CCi was appointed to quantify delay suffered to the construction of two commercial towers (43 and 39 floors respectively) in Sydney’s Central Business District (CBD) following a fire within the shared basement. Utilising a combination of windows analysis and collapsed as-built, CCi successfully identified productivity losses that were wholly unrelated to the fire and had overstated the fire’s critical path impact leading to a successful claim settlement.

Australia

7.5 Hectare Central Business District Development

CCi was appointed to quantify delay suffered to the construction of two commercial towers (43 and 39 floors respectively) in Sydney’s Central Business District (CBD) following a fire within the shared basement.

Europe

Subsea Production Umbilicals

Two damage events, both concerning cracking to the outer sheaths of the Umbilicals led to critical delay of the ‘load out’ milestone.

Australia

Floating Wet Concentrator Plant

The floating wet concentrator plant developed a sudden list (lean) to port side within the pond before settling on the bottom of the pond and mining was curtailed as a result.

UK

Humber Pipeline Tunnel

The construction of a 5km National Grid replacement tunnel 30m below the Humber Estuary supplying a quarter of the UK’s national gas became the largest and longest hydraulically inserted gas pipeline and was the heaviest moving man-made object.