714MW Offshore Wind Farm

Supply delays relating to some of the turbine jackets were alleged to have resulted in a critical delay to the project. CCi was appointed to determine the true criticality of the delay event. Using a combination of ‘but for’ and windows-based time slice analysis, CCi identified significant levels of float and flexibility within the project’s scheduled sequence, which could not be determined through the claimant’s preferred delay methodology, and ultimately led to agreement that no critical delay would likely be experienced and that no claim would be presented.

USA

High-rise Construction

Two separate water intrusion events occurred during the construction of a high-rise residential building in New York City.

Canada

Manufacturing / Heavy Industry

Following a large explosion and subsequent fire at a chemical manufacturing plant CCi was appointed by insurers to assess the duration of repairs required to restore the plant to its pre-loss production capacity.

Australia

Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date.

Australia

7.5 Hectare Central Business District Development

CCi was appointed to quantify delay suffered to the construction of two commercial towers (43 and 39 floors respectively) in Sydney’s Central Business District (CBD) following a fire within the shared basement.