714MW Offshore Wind Farm

Supply delays relating to some of the turbine jackets were alleged to have resulted in a critical delay to the project. CCi was appointed to determine the true criticality of the delay event. Using a combination of ‘but for’ and windows-based time slice analysis, CCi identified significant levels of float and flexibility within the project’s scheduled sequence, which could not be determined through the claimant’s preferred delay methodology, and ultimately led to agreement that no critical delay would likely be experienced and that no claim would be presented.

USA

Power Station

A significant fire damaged large sections of a partially constructed Power Plant. The Insured ultimately completed the project 18 months late and submitted a DSU claim for 18 months.

Saudi Arabia

Process Plant (acetic acid, CO & VAM)

Expert advisor – visiting the site in 2009/2010 and reviewing the Primavera critical path schedules to assess their reliability.

USA

High-rise Construction

Two separate water intrusion events occurred during the construction of a high-rise residential building in New York City.

UK

London Underground Line Extension Project (Crossrail)

CCI was appointed to provide commercial support and key performance and cost indicators to the executive board.