714MW Offshore Wind Farm

Supply delays relating to some of the turbine jackets were alleged to have resulted in a critical delay to the project. CCi was appointed to determine the true criticality of the delay event. Using a combination of ‘but for’ and windows-based time slice analysis, CCi identified significant levels of float and flexibility within the project’s scheduled sequence, which could not be determined through the claimant’s preferred delay methodology, and ultimately led to agreement that no critical delay would likely be experienced and that no claim would be presented.

Saudi Arabia

Process Plant (acetic acid, CO & VAM)

Expert advisor – visiting the site in 2009/2010 and reviewing the Primavera critical path schedules to assess their reliability.

London

Shangri-La Hotel in The Shard

The prestigious fit out of the Shangri La hotel within the Shard tower had many employer design issues and a contractor defect issue which resulted in the termination of the contract.

USA

High-rise Construction

Two separate water intrusion events occurred during the construction of a high-rise residential building in New York City.

UK

61MW Onshore Wind Farm

The Super Grid Transformer suffered delay during transit which led to critical delays to the phased handover of the plant.