Tamworth 330KV Capacitor Banks and SVC Works

CCi was engaged by the Subcontractor responsible for all civil and concrete works, to assess the contractual position in terms of extension of time entitlement and to produce a consolidated extension of time along with associated costs claim. CCi produced a compelling claim document that enabled the Subcontractor to recover over 80% of its claimed prolongation costs with an opportunity to negotiate the remainder. CCi’s experience was fundamental to the demonstration of the entitlement, production of the supporting evidence, and the negotiation of the settlement.

Australia

Floating Wet Concentrator Plant

The floating wet concentrator plant developed a sudden list (lean) to port side within the pond before settling on the bottom of the pond and mining was curtailed as a result.

USA

High-rise Construction

Two separate water intrusion events occurred during the construction of a high-rise residential building in New York City.

UK

Roadway Project

CCi was appointed as expert to determine the time and quantum issues arising during construction.

UK

714MW Offshore Wind Farm

Supply delays relating to some of the turbine jackets were alleged to have resulted in a critical delay to the project.