Light Railway Project

CCi was appointed as quantum and delay experts to provide opinion on delays and extensions of time, together with the assessment of the Final Account. The team ensured that the delay and extension of time analysis was presented in a way that clearly showed the delays and entitlements to time and was also readily usable in quantum assessments. The matter was on track for litigation but was settled in subsequent mediation in which the experts played a prominent role.

North Sea

Semi-Submersible

A Semi-Submersible brown field project, consisting of the conversion of a large exploration vessel to a production vessel overran in time and in money.

USA

Power Station

A significant fire damaged large sections of a partially constructed Power Plant. The Insured ultimately completed the project 18 months late and submitted a DSU claim for 18 months.

UK

275kV Infrastructure Project

CCi was appointed as the quantum expert on behalf of the contractor on a dispute between it and the conductor supplier involving an alleged defective conductor and the financial consequences of it.

Australia

Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date.