Defects identified during the grouting of the platform’s jack-up system were claimed to be the reason behind termination of the project’s construction contract. Appointed as the delay expert in litigation proceedings in the High Court, CCi’s analysis ultimately determined that an under estimation of the offshore installation scope would have resulted in a significant delay to the project in any event and contributed to the successful settlement of the claim prior to the hearing.

UAE

Aluminium Smelter

Following force majeure events, the aluminium production facility suffered a total ‘freeze’ of all operating liquid aluminium pots.

USA

Bridge Project

Construction of a bridge spanning the Ohio River was delayed as a result of flooding from a high river event.

North Sea

Semi-Submersible

A Semi-Submersible brown field project, consisting of the conversion of a large exploration vessel to a production vessel overran in time and in money.

UK

Tunnel Drive Project

A tunnel drive of several kilometres with associated shafts and bore pits encountered unexpected physical conditions.