Humber Pipeline Tunnel

The construction of a 5km National Grid replacement tunnel 30m below the Humber Estuary supplying a quarter of the UK’s national gas became the largest and longest hydraulically inserted gas pipeline and was the heaviest moving man-made object. The JV Contractors suffered a year’s delay leading up to the launch of the Tunnel Boring Machine (TBM). CCi was engaged to forensically look at the reasons for the delays under the NEC3 form of contract. It resulted in the JV and National Grid negotiating a settlement as the works continued.

Latin America

FPSO

Two FPSO’s were constructed at yards in Central America and fitted out in ports in Latin America.

Chile

210MW Solar Plant

A fire occurred in the central tower of a solar plant where the solar receiver is located.

USA

Oil Refinery

A catastrophic failure of a heat exchanger resulted in extensive damage. CCi prepared a detailed delay analysis to establish whether non-incident related works prolonged the overall period of disruption.

Europe

730MW Ultra-supercritical Coal Fired Power Station

Originally suffering a catastrophic failure of the transformer, the project suffered several delay events, including 13 instances of damage.