730MW Ultra-supercritical Coal Fired Power Station

Originally suffering a catastrophic failure of the transformer, the project suffered several delay events, including 13 instances of damage. CCi worked with the project team to establish the likely benefit of the proposed mitigation measure regarding the utilisation of a spare transformer. In addition, CCi reviewed the project’s contemporaneous records to establish the true impact of the 13 critical incidents to arrive at a successful settlement of compensation and delay entitlement.

UK

Roadway Project

CCi was appointed as expert to determine the time and quantum issues arising during construction.

Oman

International Airport

Post-tender advice to specialist contractor on FIDIC Yellow Book 1999 provisions as amended by particular conditions regarding schedule of prices, change and valuation of change prior to executing contracts.

UAE

Aluminium Smelter

Following force majeure events, the aluminium production facility suffered a total ‘freeze’ of all operating liquid aluminium pots.

Latin America

FPSO

Two FPSO’s were constructed at yards in Central America and fitted out in ports in Latin America.