730MW Ultra-supercritical Coal Fired Power Station

Originally suffering a catastrophic failure of the transformer, the project suffered several delay events, including 13 instances of damage. CCi worked with the project team to establish the likely benefit of the proposed mitigation measure regarding the utilisation of a spare transformer. In addition, CCi reviewed the project’s contemporaneous records to establish the true impact of the 13 critical incidents to arrive at a successful settlement of compensation and delay entitlement.

UK

Combined Heat and Intelligent Power Plant (CHiP)

The Contractor entered into a D&B FIDIC form of contract and suffered over a year’s delay with the design, build and commissioning of the CHiP plant.

UK

FPSO

CCi conducted a thorough timeline analysis of events surrounding catastrophic storm damage, during which four of the FPSO’s anchor chains snapped and the vessel drifted 180m off station.

Saudi Arabia

Process Plant (acetic acid, CO & VAM)

Expert advisor – visiting the site in 2009/2010 and reviewing the Primavera critical path schedules to assess their reliability.

UK

PFI Acute Emergency Hospital Project

CCi was appointed to compile numerous claim documents for MEP design fees arising from revisions to the architectural BIM model.