LNG Plant

A named windstorm caused widespread damage to the construction of an LNG plant. Significant damage was caused to pipe that had been prefabricated and was waiting to be installed at the facility. CCi carried out an analysis of the delays incurred to the project prior to the storm and identified pre-storm delay that had not been accounted for in the forecast Commercial Operation Date (COD). In addition, CCi identified delays to the fabrication and installation of structural steel that meant the delay caused to the COD by having to replace pipe was much less than originally claimed by the Insured.

Thailand

Underground Potash Mine

During commissioning of the mine, an underground inrush flooded the mine causing damage.

Canada

Oil & Gas

At the procurement stage of an Oil Sands Project, worked with the Owner’s Supply Chain and Legal departments over two years to prepare requests for proposal and draft, negotiate and resolve construction contracts.

India

Crude Oil Refinery

Unprecedented rainfall caused significant damage to stored equipment at the world’s largest refining hub, with crude processing capacity of 1.24 million barrels per day.

USA

Bridge Project

Construction of a bridge spanning the Ohio River was delayed as a result of flooding from a high river event.