Crude Oil Refinery

Unprecedented rainfall caused significant damage to stored equipment at the world’s largest refining hub, with crude processing capacity of 1.24 million barrels per day. CCi was appointed to evaluate delays that occurred to the start-up of the J3 units affected by the flood. CCi identified the impact of manufacturing lead times of replacement equipment on the unit critical paths to notify insurers of their potential exposure.

Norway

MOPUstor Platform

Defects identified during the grouting of the platform’s jack-up system were claimed to be the reason behind termination of the project’s construction contract.

Chile

210MW Solar Plant

A fire occurred in the central tower of a solar plant where the solar receiver is located.

USA

Potash Mine

A conveyor at a Potash mine that carried product to warehouses before it could be loaded onto trains and distributed to customers collapsed.

London

Shangri-La Hotel in The Shard

The prestigious fit out of the Shangri La hotel within the Shard tower had many employer design issues and a contractor defect issue which resulted in the termination of the contract.