Shangri-La Hotel in The Shard

The prestigious fit out of the Shangri La hotel within the Shard tower had many employer design issues and a contractor defect issue which resulted in the termination of the contract. CCi carried out a detailed time slice windows analysis to identify both the employer delay events and contractor performance and defect issues. Following a mediation, the employer started proceedings to the Technology & Construction Court, though within two months of the mediation the parties agreed a negotiated settlement.

Australia

Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date.

USA

Oil Refinery

A catastrophic failure of a heat exchanger resulted in extensive damage. CCi prepared a detailed delay analysis to establish whether non-incident related works prolonged the overall period of disruption.

Europe

730MW Ultra-supercritical Coal Fired Power Station

Originally suffering a catastrophic failure of the transformer, the project suffered several delay events, including 13 instances of damage.

USA

Bridge Project

Construction of a bridge spanning the Ohio River was delayed as a result of flooding from a high river event.