London Underground Line Extension Project (Crossrail)

CCI was appointed to provide commercial support and key performance and cost indicators to the executive board. This involved managing and reporting on change, risk and forecasts, assisting with identification and resolution of potential claims using negotiation and avoidance techniques.

Costa Rica

40Ha Container Terminal

Storm damage during the dredging and reclamation phase of the project resulted in the implementation of a suite of mitigation measures.

USA

Bridge Project

Construction of a bridge spanning the Ohio River was delayed as a result of flooding from a high river event.

USA

Oil Refinery

A catastrophic failure of a heat exchanger resulted in extensive damage. CCi prepared a detailed delay analysis to establish whether non-incident related works prolonged the overall period of disruption.

Europe

Double Deck Tunnel

A series of incidents concerning a Tunnel Boring Machine (TBM) with a diameter of 13.7m, were claimed to have caused delay to the critical path of the project.