Floating Wet Concentrator Plant

The floating wet concentrator plant developed a sudden list (lean) to port side within the pond before settling on the bottom of the pond and mining was curtailed as a result. CCi reviewed and reported on the duration of the reinstatement element of the works, with specific concentration on the duration of the work relating to the rectification of damage as a result of the incident, absent improvement and maintenance works.

UK

275kV Infrastructure Project

CCi was appointed as the quantum expert on behalf of the contractor on a dispute between it and the conductor supplier involving an alleged defective conductor and the financial consequences of it.

UK

PFI Acute Emergency Hospital Project

CCi was appointed to compile numerous claim documents for MEP design fees arising from revisions to the architectural BIM model.

India

Crude Oil Refinery

Unprecedented rainfall caused significant damage to stored equipment at the world’s largest refining hub, with crude processing capacity of 1.24 million barrels per day.

USA

Potash Mine

A conveyor at a Potash mine that carried product to warehouses before it could be loaded onto trains and distributed to customers collapsed.