61MW Onshore Wind Farm

The Super Grid Transformer suffered delay during transit which led to critical delays to the phased handover of the plant. CCi was appointed as the delay expert to help quantify the extent to which the project had suffered delay to its commercial operation date as a result of damage. Working with very limited available information, CCi worked collaboratively and flexibly with the insured to establish the overall project status and achieve a successful settlement of the claim.

UAE

Aluminium Smelter

Following force majeure events, the aluminium production facility suffered a total ‘freeze’ of all operating liquid aluminium pots.

Brazil

1.4GW Combined Cycle Power Plant

During the equipment commissioning operation for the project’s steam turbine unit, a system error triggered an unscheduled shutdown of the lubricating oil pumps causing damage to the turbine shaft.

Chile

210MW Solar Plant

A fire occurred in the central tower of a solar plant where the solar receiver is located.

Australia

Floating Wet Concentrator Plant

The floating wet concentrator plant developed a sudden list (lean) to port side within the pond before settling on the bottom of the pond and mining was curtailed as a result.