Combined Heat and Intelligent Power Plant (CHiP)

The Contractor entered into a D&B FIDIC form of contract and suffered over a year’s delay with the design, build and commissioning of the CHiP plant. CCi carried out an in-depth analysis tracing the design delays in respect of the employers operating philosophy of the plant, which linked to the delays suffered in construction and later the commissioning issues. CCi identified significant culpability and concurrency issues and, following advice, the two parties eventually settled.

Canada

Oil & Gas

At the procurement stage of an Oil Sands Project, worked with the Owner’s Supply Chain and Legal departments over two years to prepare requests for proposal and draft, negotiate and resolve construction contracts.

UK

Humber Pipeline Tunnel

The construction of a 5km National Grid replacement tunnel 30m below the Humber Estuary supplying a quarter of the UK’s national gas became the largest and longest hydraulically inserted gas pipeline and was the heaviest moving man-made object.

UK

PFI Acute Emergency Hospital Project

CCi was appointed to compile numerous claim documents for MEP design fees arising from revisions to the architectural BIM model.

Auckland, New Zealand

Puhoi to Warkworth Motorway

CCi provided Independent delay expert service for the Contractor. The project was delivered through Public-Private Partnership between the New Zealand Government and the Northern Express Group (NX2) to design and construct a four-lane highway with a central median safety barrier.