Ferrochrome Smelter

A catastrophic breakout of molten metal caused significant damage to the construction of the ferrochrome melt shop. CCi was appointed as delay expert to objectively separate critical delay from the breakout and delays resultant from ongoing procurement issues for key equipment located elsewhere in the project. CCi conducted a ‘but for’ assessment of the project status based on contemporaneous information and a detailed review of ‘pacing’. Both assessments contributed to a successful claim settlement.

Australia

Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date.

Australia

7.5 Hectare Central Business District Development

CCi was appointed to quantify delay suffered to the construction of two commercial towers (43 and 39 floors respectively) in Sydney’s Central Business District (CBD) following a fire within the shared basement.

North Sea

Semi-Submersible

A Semi-Submersible brown field project, consisting of the conversion of a large exploration vessel to a production vessel overran in time and in money.

Europe

187MW Hydro Power Plant

Following the collapse of the project’s headrace tunnel, CCi was appointed as the delay expert to produce an analysis that would eventually facilitate a mediated settlement.