FPSO

CCi conducted a thorough timeline analysis of events surrounding catastrophic storm damage, during which four of the FPSO’s anchor chains snapped and the vessel drifted 180m off station. Through review of the project’s data and contemporaneous records, CCi’s assessment into the extent to which the hull-related maintenance works extended the overall interruption period contributed to the successful negotiated claim settlement.

London

Shangri-La Hotel in The Shard

The prestigious fit out of the Shangri La hotel within the Shard tower had many employer design issues and a contractor defect issue which resulted in the termination of the contract.

Australia

Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date.

UK

61MW Onshore Wind Farm

The Super Grid Transformer suffered delay during transit which led to critical delays to the phased handover of the plant.

Auckland, New Zealand

Puhoi to Warkworth Motorway

CCi provided Independent delay expert service for the Contractor. The project was delivered through Public-Private Partnership between the New Zealand Government and the Northern Express Group (NX2) to design and construct a four-lane highway with a central median safety barrier.