Airport Link Motorway

It was claimed that seven separate events had caused critical delay to the project’s completion date. CCi was appointed as the critical path expert to benchmark the project’s pre-incident status and levels of available float, and to advise as to the expected impact of the events. CCi’s critical path analysis ultimately demonstrated that due to the management of activity relationships, criticality was artificially imposed upon certain areas. Following a recalibration of activity relationships, it was agreed that the events had had no impact.

Oman

International Airport

Post-tender advice to specialist contractor on FIDIC Yellow Book 1999 provisions as amended by particular conditions regarding schedule of prices, change and valuation of change prior to executing contracts.

North Sea

Semi-Submersible

A Semi-Submersible brown field project, consisting of the conversion of a large exploration vessel to a production vessel overran in time and in money.

UK

Humber Pipeline Tunnel

The construction of a 5km National Grid replacement tunnel 30m below the Humber Estuary supplying a quarter of the UK’s national gas became the largest and longest hydraulically inserted gas pipeline and was the heaviest moving man-made object.

Europe

730MW Ultra-supercritical Coal Fired Power Station

Originally suffering a catastrophic failure of the transformer, the project suffered several delay events, including 13 instances of damage.