Bridge Project

Construction of a bridge spanning the Ohio River was delayed as a result of flooding from a high river event. CCi was retained by underwriters to investigate the amount of delay caused to the project completion date by repairing damage from the flood. CCi’s analysis showed that while the flood had caused critical delay to the project completion date at the time of the loss, delays to procurement of sections of the bridge after the loss meant ultimately the flood caused no actual delay to the project completion date.

Costa Rica

40Ha Container Terminal

Storm damage during the dredging and reclamation phase of the project resulted in the implementation of a suite of mitigation measures.

London

Shangri-La Hotel in The Shard

The prestigious fit out of the Shangri La hotel within the Shard tower had many employer design issues and a contractor defect issue which resulted in the termination of the contract.

Europe

187MW Hydro Power Plant

Following the collapse of the project’s headrace tunnel, CCi was appointed as the delay expert to produce an analysis that would eventually facilitate a mediated settlement.

Europe

730MW Ultra-supercritical Coal Fired Power Station

Originally suffering a catastrophic failure of the transformer, the project suffered several delay events, including 13 instances of damage.