Manufacturing / Heavy Industry

Following a large explosion and subsequent fire at a chemical manufacturing plant CCi was appointed by insurers to assess the duration of repairs required to restore the plant to its pre-loss production capacity. CCi’s analysis identified a number of additional construction activities in the rebuild timeline that were not required to repair the property to the condition it was in prior to the loss and amounted to an improved design of the plant.

Thailand

Underground Potash Mine

During commissioning of the mine, an underground inrush flooded the mine causing damage.

UK

Roadway Project

CCi was appointed as expert to determine the time and quantum issues arising during construction.

Colombia

2400MW Hydro Power Plant

Failure of the Auxiliary Diversion Tunnel (ADT) and subsequent flooding of the underground power complex caused severe delay to the completion of this project, resulting in fundamental changes in the design.

London

Shangri-La Hotel in The Shard

The prestigious fit out of the Shangri La hotel within the Shard tower had many employer design issues and a contractor defect issue which resulted in the termination of the contract.