FPSO

Two FPSO’s were constructed at yards in Central America and fitted out in ports in Latin America. The Projects overran in both time and cost, resulting in claims exceeding US$1bn. Detailed quantum investigations were undertaken, tens of thousands of cost files in multiple languages were analysed, and a final figure presented for Arbitration. Then at a New York venue, expert evidence was given and was well received by a panel of three international arbitrators.

UK

275kV Infrastructure Project

CCi was appointed as the quantum expert on behalf of the contractor on a dispute between it and the conductor supplier involving an alleged defective conductor and the financial consequences of it.

Canada

Manufacturing / Heavy Industry

Following a large explosion and subsequent fire at a chemical manufacturing plant CCi was appointed by insurers to assess the duration of repairs required to restore the plant to its pre-loss production capacity.

UK

FPSO

CCi conducted a thorough timeline analysis of events surrounding catastrophic storm damage, during which four of the FPSO’s anchor chains snapped and the vessel drifted 180m off station.

UK

714MW Offshore Wind Farm

Supply delays relating to some of the turbine jackets were alleged to have resulted in a critical delay to the project.