Tamworth 330KV Capacitor Banks and SVC Works

CCi was engaged by the Subcontractor responsible for all civil and concrete works, to assess the contractual position in terms of extension of time entitlement and to produce a consolidated extension of time along with associated costs claim. CCi produced a compelling claim document that enabled the Subcontractor to recover over 80% of its claimed prolongation costs with an opportunity to negotiate the remainder. CCi’s experience was fundamental to the demonstration of the entitlement, production of the supporting evidence, and the negotiation of the settlement.

Europe

Subsea Production Umbilicals

Two damage events, both concerning cracking to the outer sheaths of the Umbilicals led to critical delay of the ‘load out’ milestone.

Chile

210MW Solar Plant

A fire occurred in the central tower of a solar plant where the solar receiver is located.

Europe

Double Deck Tunnel

A series of incidents concerning a Tunnel Boring Machine (TBM) with a diameter of 13.7m, were claimed to have caused delay to the critical path of the project.

Thailand

Underground Potash Mine

During commissioning of the mine, an underground inrush flooded the mine causing damage.