Steel Plant

The exhaust pipe from the top of a steel furnace collapsed through the roof and required repair before the furnace could return to production. During the demolition of the damaged structure, the crane removing debris overturned and caused additional damage and delay. CCi was appointed by Insurer’s to analyse the repair timeline and determine whether the second event had caused an increase to the interruption period of the furnace. CCi established the date the repairs should have completed if the second event had not occurred, and the additional delay caused by repairing damage from the second event.

USA

Bridge Project

Construction of a bridge spanning the Ohio River was delayed as a result of flooding from a high river event.

Europe

730MW Ultra-supercritical Coal Fired Power Station

Originally suffering a catastrophic failure of the transformer, the project suffered several delay events, including 13 instances of damage.

UAE

Aluminium Smelter

Following force majeure events, the aluminium production facility suffered a total ‘freeze’ of all operating liquid aluminium pots.

London

Shangri-La Hotel in The Shard

The prestigious fit out of the Shangri La hotel within the Shard tower had many employer design issues and a contractor defect issue which resulted in the termination of the contract.