Steel Plant

The exhaust pipe from the top of a steel furnace collapsed through the roof and required repair before the furnace could return to production. During the demolition of the damaged structure, the crane removing debris overturned and caused additional damage and delay. CCi was appointed by Insurer’s to analyse the repair timeline and determine whether the second event had caused an increase to the interruption period of the furnace. CCi established the date the repairs should have completed if the second event had not occurred, and the additional delay caused by repairing damage from the second event.

UK

Ground Engineering and Geotechnical Pre-construction Services Project (HS2)

CCi was appointed to provide claims management support on the largest geotechnical ground investigation programme in Europe, delivered from commencement to final account.

Latin America

FPSO

Two FPSO’s were constructed at yards in Central America and fitted out in ports in Latin America.

UK

PFI Acute Emergency Hospital Project

CCi was appointed to compile numerous claim documents for MEP design fees arising from revisions to the architectural BIM model.

Europe

Double Deck Tunnel

A series of incidents concerning a Tunnel Boring Machine (TBM) with a diameter of 13.7m, were claimed to have caused delay to the critical path of the project.