Steel Plant

The exhaust pipe from the top of a steel furnace collapsed through the roof and required repair before the furnace could return to production. During the demolition of the damaged structure, the crane removing debris overturned and caused additional damage and delay. CCi was appointed by Insurer’s to analyse the repair timeline and determine whether the second event had caused an increase to the interruption period of the furnace. CCi established the date the repairs should have completed if the second event had not occurred, and the additional delay caused by repairing damage from the second event.

Chile

210MW Solar Plant

A fire occurred in the central tower of a solar plant where the solar receiver is located.

London

Shangri-La Hotel in The Shard

The prestigious fit out of the Shangri La hotel within the Shard tower had many employer design issues and a contractor defect issue which resulted in the termination of the contract.

UK

714MW Offshore Wind Farm

Supply delays relating to some of the turbine jackets were alleged to have resulted in a critical delay to the project.

Australia

Vanadium Mine

Following fire damage at the world’s largest vanadium mine, two divergent hypothetical timelines emerged relating to the redesigned reinstatement of the beneficiation process plant.